    SYSCO-Environment Protection Measures
    Measures
    2017 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      IT hardware upgrade and consolidationReduced 4 mt/year CO2
      2
      CPL exhuast fan electricity usage improvementReduced 7 mt/year CO2
      3
      Energy saving plan for CG2 supply blower damperReduced 81 mt/year CO2
      4
      CG2 air wiping electricity usage improvementReduced 629 mt/year CO2


    2016 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      CR plant water heater electricity usage improvementReduced 8 mt/year CO2
      2
      IT server systems upgrade and consolidationReduced 4 mt/year CO2
      3
      CPL dryer electricity usage improvementReduced 5 mt/year CO2
      4
      CPL exhuast fan electricity usage improvementReduced 18 mt/year CO2
      5
      CC2 painting room ventilation motor electricity usage improvementReduced 103 mt/year CO2
      6
      CT-902/903 cooling tower fan efficiency improvement Reduced 108 mt/year CO2
      7
      CR2 exhaust gas fan energy savingReduced 249 mt/year CO2
      8
      CC1 No.1 coater supply fan electricity usage improvement Reduced 7 mt/year CO2
      9
      CC2 steam capacity improvement to reduce outsourcingReduced 1464 mt/year CO2


    2015 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      Reduction of Prod. building duty-room air-con electricity usageReduced 3 mt/year CO2
      2
      Prod. building 24hr air-con system consolidationReduced 40 mt/year CO2
      3
      Gas consumption improvement of CG1Reduced 14 mt/year CO2
      4
      Improvement of CR plant illuminationReduced 84 mt/year CO2
      5
      Improvement of CC plant illuminationReduced 81 mt/year CO2
      6
      Gas usage improvement of waste gas incinerator of CC1Reduced 127 mt/year CO2
      7
      Installation of rooftop solar power systemReduced 73 mt/year CO2
      8
      Air compressor electricity usage improvementReduced 470 mt/year CO2
      9
      CT-901 cooling tower fan electricity usage improvementReduced 176 mt/year CO2

    2014 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      Reduction of power consumption for air-con unit of Prod. BuildingReduced 53 mt/year CO2
      2
      10 Tons electric air conditioner energy-saving for Electric Materials WarehouseReduced 5 mt/year CO2
      3
      Improvement of equipment partial illuminationReduced 15 mt/year CO2
      4
      Improvement of factory building illuminationReduced 270 mt/year CO2
      5
      Improvement of compressed air dryer electricity usageReduced 54 mt/year CO2
      6
      Gas usage improvement of exhaust gas incinerator improvement of CC2Reduced 2573 mt/year CO2
      7
      CG2 NOF recuperative replacementReduced 79 mt/year CO2
      8
      Laboratory room air conditioning electricity usage improvement Reduced 10 mt/year CO2
      9
      Upgrade PC workstations as energy-saving equipment Reduced 5 mt/year CO2
      10
      Garbage classification, recycling and reuse Re-used 194 mt/year garbage

    2013 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      Improvement of factory building illuminationReduced 118 mt/year CO2
      2
      Improvement of CR1 illuminationReduced 12 mt/year CO2
      3
      Air compressor improvement for utility plantReduced 672 mt/year CO2
      4
      Garbage classification, recycling and reuse Re-used 121 mt/year garbage

    2012 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      Air-con efficiency improvement of Prod. BuildingReduced 13 mt/year CO2
      2
      Air-con efficiency improvement of Prod. Building CPU RoomReduced 5 mt/year CO2
      3
      Air-con control pannel improvement of Prod. BuildingReduced 14 mt/year CO2
      4
      Plan-wide 24 hours control room & shop-flow LED lamps improvement Reduced 72 mt/year CO2
      5
      CG1 burner energy saving component improvement Reduced 96 mt/year CO2
      6
      CT-902 cooling tower fan efficiency improvement Reduced 37 mt/year CO2
      7
      RCC system energy saving improvementReduced 53 mt/year CO2
      8
      Garbage classification, recycling and reuse Re-used 95 mt/year garbage

    2011 Environment Protection Measures
      Item
      Contents of measure
      Actual Results
      1
      Energy saving project for air-cooled liquid chillers of Adm. Building(*) Reduced 10 mt/year CO2
      2
      Air-con efficiency improvement of Prod. Building(*) Reduced 27 mt/year CO2
      3
      Reduction of CR1 compressed air consumption(*) Reduced 97 mt/year CO2
      4
      Electricity consumption reduction of CG1/PAL illumination(*) Reduced 9 mt/year CO2
      5
      Increase of power sub-station's high pressure power factor(*) Reduced 152 mt/year CO2
      6
      Installation of external invertor on air-con system of Electricity Room(*) Reduced 1,226 mt/year CO2
      7
      Power consumption redution of CR1 rolling(*) Reduced 478 mt/year CO2
      8
      Power consumption reduction of electrolytical basin(*) Reduced 3 mt/year CO2
      9
      Garbage classification, recycling and reuse Re-used 107 mt/year garbage
      Remarks: (*) represents that the improvement plan has passed the third party's audit.

    2010 Environment Protection Measures
      Item
      Contents of Plan
      Actual Results
      1
      Reduction of power consumption for air-con unit of computing room(*)Reduce 5 MT CO2
      2
      Energy saving plan for air-cooled liquid chiller of Adm. BuildingReduce 21.2 MT CO2
      3
      Illumination improvement of Instrumentation Office(*) Reduce 66 MT CO2
      4
      Management of CR2 waste power(*) Reduce 3 MT CO2
      5
      Energy saving plan for exhaust fans on roof of CC1 Reduce 46.7 MT CO2
      6
      Reduction of ARP gas consumption(*) Reduce 571 MT CO2
      7
      Installation of external invertor to improve air-con power consumption(*) Reduce 67 MT CO2
      8
      Garbage classification, recycling and reuseRe-used 107.5 MT garbage
      Remarks: (*) represents that the improvement plan has passed the third party's audit.

    2009 Environment Protection Measures
      Item
      Contents of Plan
      Actual Results
      1
      Plan to put fir-proof cotton on top of GL pot to save energyReduced 66 MT CO2
      2
      Plan to reduce air consumption for CR2 Mill rolling(*)Reduced 355 MT CO2
      3
      Power consumption improvement for air-cooled liquid chillers at both Adm. & Prod. Buildings Reduced 123 mt Co2Reduced 123 MT CO2
      4
      Power consumption improvement for plant-wide individual air- con unit(*) Reduced 297 MT CO2
      5
      Garbage classification, recycling and resueRe-use 119.9 MT garbage
      Remarks: (*) represents that the improvement plan has passed the third party's audit.

    2008 Environment Protection Measures
      Item
      Contents of Plan
      Actual Results
      1
      Power saving from scrap conveyor at Continuous Pickling Line(*)Reduced 4.5 MT CO2
      2
      Energy saving device for heat insulation cover at GI Pot(*)Reduced 198.44 MT CO2
      3
      Return-Pump power comsumption improvement(*)Reduced 290 MT CO2
      4
      Reducing CR1 coolant pump circulation from 70% to 50%(*)Reduced 67 MT CO2
      5
      Shutting one of stand-by mixers of coolant tank at CR1 & CR2(*)Reduced 1,184 MT CO2
      6
      Installation of alarm sensor for cooling water level switch at Pot Inductor to avoid overflow(*)Reduced 66 MT CO2
      7
      Reuse of recyclable garbageRe-used 114.5 MT garbage
      Remarks: (*) represents that the improvement plan has passed the third party's audit.

    2007 Environment Protection Measures
      Item
      Contents of Plan
      Actual Results
      1
      Waste heat recycled from #2 CCLReduced 2,308 MT CO2
      2
      Reduction of power consumed in cooling water pumping(*) Reduced 400 MT CO2
      3
      Recycle and reuse of waste water from skin pass of CG linesRecycled 57,096 MT water
      4
      Reduction of compressed air consumed in CG lines(*) Reduced 335 MT CO2
      5
      Reduction of cleaning detergent consumed in CC linesReduced 67.4 MT detergent
      6
      Reuse of recyclable garbageRe-used 83.6 MT garbage
      Remarks: (*) represents that the improvement plan has passed the third party's audit.